|
The squaring section plays a very important role in the preparation of the blocks that have just been extracted. The main task of this section precisely, is to prepare the bottoms and tops of rough blocks, which then must be stored to sell or to go through another stage of processing, such as cutting slabs in the frames. An area of about 15,000 square meters equipped with overhead cranes is positioned on various squaring lines , in this area the storage of blocks takes place.
Here are some illustrative screenshots.
|